Pengerang Power Sdn Bhd (Petronas)

Scope of Work Main Contractor Location
Contract for Engineering, Procurement, Construction and Commissioning (EPCC) for the Development of Pengerang 275kV Overhead Transmission Line From Pengerang Cogen Plant (PCP) To Peninsular Malaysia Grid and 275/132kV Pengerang Substation (“Contract”) Trenergy Infrastructure Sdn Bhd Johor

Tenaga Nasional Berhad

Scope of Work Main Contractor Location
Proposed 132kV Single Circuit Loop In/Out Into PMU 132/33kV Enstek From KLIA-Salak Tinggi Transmission Line Trenergy Infrastructure Sdn Bhd Selangor

Tenaga Nasional Berhad

Scope of Work Main Contractor Location
Mainhead B : Establishment of 275 kV (1000MVA) Overhead Line From Point A to Ulu Jelai Temporary Trenergy Infrastructure Sdn Bhd Pahang

Tenaga Nasional Berhad

Scope of Work Main Contractor Location
Kerja-Kerja menggantikan Menara di sebabkan oleh Cadangan Pembinaan Mass Rapid Transit (MRT) yang merentasi AP20 dan AP21 Talian Penghantaran 275/132kV Mahkota Cheras – Bandar Tun Razak/ Sedang / Balakong Trenergy Infrastructure Sdn Bhd Selangor

Tenaga Nasional Berhad

Scope of Work Main Contractor Location
Proposed Establishment of 275/132 kV Double Circuit Loop in/out into PMU Mahkota Cheras from existing line Bandar Tun Razak – Serdang/Balakong Trenergy Infrastructure Sdn Bhd KL/Selangor

Tenaga Nasional Berhad

Scope of Work Main Contractor Location
Proposed 275kV Bulk Supply to Bahru Stainless (275kV Double Circuit Overhead Line From PMU Cahaya Baru to Bahru Stainless Substation) AMBC Transmission Sdn. Bhd. Johor